The Florida Department of Transportation (FDOT), District Six is conducting a Project Development and Environment (PD&E) Study for the I-195/State Road (SR) 112/Julia Tuttle Causeway from NW 12 Avenue to SR 907/Alton Road and along the local street network surrounding the ramp terminals. The project is located within the cities of Miami and Miami Beach in Miami-Dade County, Florida. Status: In 2020, a Corridor Planning Study (CPS) was completed which identified and developed, through a process of collaborative stakeholder coordination, conceptual improvements within the I-195 Study corridor in order to address the future mobility and safety needs. The PD&E Study Phase, which began in summer 2022, will complete the required preliminary engineering and environmental documentation. This includes the review and analysis of potential impacts from the proposed project on the social, economic, natural, physical, and cultural environments. Public involvement is an extremely important part of a PD&E Study to inform citizens and provide interested persons an opportunity to be involved in the development of the project. For information on the Corridor Planning Study, click link below:https://www.fdotmiamidade.com/I195CorridorPlanningStudy.html